The council of ministers adopted on 13 july 2021 the strategic project for the recovery and Economic Transformation (L) of electric vehicles and Connected, a project based on collaboration público-privada and focused on the strengthening of the value chains for the automotive industry, a strategic sector for spain.
The objective of this LOSS is to create in Spain the ecosystem to be given to the development and manufacture of electric vehicles and connected to the network and convert to spain in the european Hub electromovilidad. The development of this project envisages a total investment of more than 24,000 billion in the period 2021-2023, with a contribution of the public sector 4,300 million euros and a private investment of $19.7 million euros.
Order ICT/209/2002 of 17 march (BOE 18/03/2022)that makes the call for the year 2022 and modifies the order ICT/1466/2021, of 23 december, establishing the regulatory basis for granting aid to comprehensive action industrial chain of electric vehicles and connected in the strategic project for the recovery and Economic Transformation in the area of electric vehicles and Connected (LOSS VEC), in the framework of the recovery Plan, transformation and Resilience.
Order ICT/1466/2021, of 23 december (BOE 28/12/2021)establishing the regulatory basis for granting aid to comprehensive action industrial chain of electric vehicles and connected in the strategic project for the recovery and Economic Transformation in the area of electric vehicles and Connected (LOSS VEC), in the framework of the recovery Plan, transformation and Resilience.
Help us improve. If you wish, you can complete this quality survey of our services.
Data collection at the national level on inspections, maintenance, breakdowns and accidents of elevators, considering the provisions of the Royal Decree 355/2024, of 2 april, which approves the Supplementary Technical Instruction ITC AEM 1 "Lifts ’. This law regulates the commissioning, modification, maintenance and inspection of the lifts, as well as promoting the safety of existing elevator park. Such data will serve to assess the effectiveness of security measures implemented and to identify areas for improvement in the legislation, as well as in the management and operation of the lifts in the entire national territory.
Thanks for your comments.