detalle-procedimientos

Se comunica que el prestador de servicios de confianza de la FNMT va a realizar una intervención programada de mantenimiento el próximo sábado 26/10/2024 entre las 12:05 a 12:35 horas aproximadamente que afectaría a todos sus servicios, pudiendo repercutir a la validación del estado de revocación de los certificados emitidos por dicho prestador.

BACK
Description

The Royal Decree 872/2024, is to regulate the granting of a direct subsidy Cobra Solutions S.L.U., for the implementation of the project “ Green Charged ”. This project has been selected as a result of an open call to form part of a great integrated transboundary project, designed jointly by several member states, and whose objective is the generation of renewable hydrogen and contribute significantly to the protection of the environment, in the common interest of the european union.

Access Mode
Digital Certificate
Management Centre
State Secretariat for Industry - E04934403
Directorate General
General Directorate of Industrial Strategy and Small and Medium Enterprises
Management unit
G.S. for Entrepreneurship and SMEs
Topic
Subsidies, Grants and Awards

Submission of applications

Term of the proceedings
Dimensioning, since 9/5/2024 to 10/16/2024Out of time

Regulatory

Royal Decree 872/2024 of 3 september, which governs the granting, directly for a subvention to the company Collects Solutions, S.L.U., for the implementation of the project Green Cobra, within the framework of the recovery Plan, transformation and Resilience.

Access procedure

Digital Certificate

Access to application

Access to subsanaciones allegations and other shipments

Support information for all access modes

Documents:

Annex I - Memory substantive evaluation compliance DNSH [DOCX] [83 KB]

Annex II - Statement assignment and treatment actions PRTR data [DOCX] [80 KB]

Annex III - Statement absence conflict interest (DACI) beneficiary [DOCX] [80 KB]

Annex IV - Statement responsible other aid requested or perceived [DOCX] [81 KB]

Annex V - Statement execution proceedings commitment PRTR [DOCX] [80 KB]

Annex VI - declarations responsible [DOCX] [81 KB]

Annex VIII - procedures for audit [DOCX] [85 KB]

Document V. List of subcontractors and subcontratadas.docx DOCX [activities] [82 KB]

Additional information

If given a role to play in the completion of the requests please contact the Virtual Office, explaining the problem and attaching, depending on the case, the screens of error. Please provide details of your name and phone number and one of our technicians will contact you, on the phone that indicates, in the shortest possible time.

For any clarification regarding the processing of your application you can contact the subdirectorate General Industrial strategies and Ecosystems through e-mail:

Email: sganalisissectores@mintur.es

It is recommended to read the following document dealing with the submission of applications.

Instructions to complete the form of subsidy and documents to upload: Guía de solicitud.docx [DOCX] [95 KB]

Management Information System Procedures

S.I.A. Code: 2984772
Direct grant of aid by the Secretary of State for Industry under the Recovery, Transformation and Resilience Plan

Help us improve. If you wish, you can complete this quality survey of our services.

Information on treatment of Personal data

Basic information data protection

The personal Level - 1
State secretariat for industry
Goal of treatment

Data collection at the national level on inspections, maintenance, breakdowns and accidents of elevators, considering the provisions of the Royal Decree 355/2024, of 2 april, which approves the Supplementary Technical Instruction ITC AEM 1 "Lifts ’. This law regulates the commissioning, modification, maintenance and inspection of the lifts, as well as promoting the safety of existing elevator park. Such data will serve to assess the effectiveness of security measures implemented and to identify areas for improvement in the legislation, as well as in the management and operation of the lifts in the entire national territory.

Legal basis for the Treatment
Royal Decree 355/2024, of 2 april, which approves the Supplementary Technical Instruction ITC AEM 1 "Lifts ’, which regulates the commissioning, modification, maintenance and inspection of the lifts, as well as the safety of existing elevator park
Additional information and rights
Additional information is available and on the exercise of their rights in:https :// www.mintur.gob.es/es-es/proteccion-datos/